1300 Series Gold Processing Machine Heavy Duty Gold Milling Machine

Product Details
Customization: Available
Type: Hard Rock Gold Mining Equipment
Motor Type: AC Motor
Diamond Member Since 2025

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Flexible Customization
The supplier provides Flexible customization services for your Personalized requirements
R&D Capabilities
The supplier has 1 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (8)
  • 1300 Series Gold Processing Machine Heavy Duty Gold Milling Machine
  • 1300 Series Gold Processing Machine Heavy Duty Gold Milling Machine
  • 1300 Series Gold Processing Machine Heavy Duty Gold Milling Machine
  • 1300 Series Gold Processing Machine Heavy Duty Gold Milling Machine
  • 1300 Series Gold Processing Machine Heavy Duty Gold Milling Machine
  • 1300 Series Gold Processing Machine Heavy Duty Gold Milling Machine
Find Similar Products
  • Overview
  • Product Description
  • Main Product
  • Company Profile
  • Certifications
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
JM-1600
Motor Power
5.5kw
Application
Mine
Materials
Stone,Ore,Coal,Sand,Gold
Outlet Size
18-48mm
Inlet Size
300×1300mm
Condition
New
Warranty
1 Years
After-sales Service
Online Video or Dispatch After-Sales Team
MOQ
1 Set
Weight
5000 Kg
Capacity(T/H)
3-40 T/H
Core Components
Bearing, Motor, Gear
Transport Package
Standard Wooden Case
Specification
3020*2400*2100
Trademark
ZHIYAN
Origin
Jiangxi, China
HS Code
8459590000
Production Capacity
50 Set/Year

Product Description

1300 Series Gold Processing Machine Heavy Duty Gold Milling Machine
Product Description

1300 Series Gold Processing Machine Heavy Duty Gold Milling Machine
Gold grinding machine is mainly working for preliminary grinding for gold, silver,lead, zinc,iron, molybdenum,copper,antimony ore concentration, but also one of the main replaced equipment of ball mill. The device is suitable in small-scale mining, transportation inconvenience, lack of electricity supply in remote mine. It's with simple installation, lower investment, high output, lower production costs and fast grinding speed and so on.
 

1300 Series Gold Processing Machine Heavy Duty Gold Milling Machine

High Recovery Rate (Up to 98%!)

Optimized grinding chamber design ensures thorough ore dissociation, freeing gold particles for cyanidation, gravity separation, or flotation.

Energy-Saving & Low Cost

Reinforced rollers and durable grinding base reduce power consumption by 30% vs. conventional mills. Diesel engine options available for off-grid mining sites!
Versatile Ore Adaptability
Processes quartz veins, oxidized ores, and hard rock gold. Compatible with Wet Pan Mill or Ball Mill configurations for coarse/fine grinding.
Easy Operation & Maintenance
Modular design allows quick part replacement. Minimal training needed for operators.
1300 Series Gold Processing Machine Heavy Duty Gold Milling Machine
model specification motor production speed weight
1100 1100*180*80*250 5.5 KW 500 KG/H 17-19 r/min 4500 kg
1200 1200*180*80*250 7.5 KW 1000 KG/H 17-19 r/min 5000 kg
1300 1300*250*150*350 15 KW 1500 KG/H 16-18r/min 6500 kg
1400 1400*250*150*350 18.5 KW 2000 KG/H 16-18 r/min 7500 kg
1500 1500*350*200*460 22 KW 2500 KH/G 20-22 r/min 11000 kg
1600 1600*400*200*500 30 KW 3000 KG/H 20-22 r/min 12000 kg
Main Product

1300 Series Gold Processing Machine Heavy Duty Gold Milling Machine

Company Profile


1300 Series Gold Processing Machine Heavy Duty Gold Milling Machine

Zhiyan Future Machinery Equipment (Xiamen) Co., Ltd. was established in XiamenCity, Fujian Province. The companyadheres to the values of *inteligent innovationand Precision Engineering, Jointly Expanding Green Energy, empoweringthe sustain.able development of the global mining industry with technology, and helping tobuild a new ecosystem foreffcient resource utilization, We offer comprehensive ser.vices including project design, process optimization, andcustomized production ofboth standard and non-standard equipment.
1300 Series Gold Processing Machine Heavy Duty Gold Milling Machine
Certifications

 

1300 Series Gold Processing Machine Heavy Duty Gold Milling Machine
Packaging & Shipping

 

1300 Series Gold Processing Machine Heavy Duty Gold Milling Machine
FAQ

Q1: What types of ores is your equipment suitable for?
A1: The mineral processing eauipment we provide is suitable for various ores, including but not limited to: metalicores, non-metallic ores, rare ores, etc. The process flow can be customized according to the characteristics ofthe ore (hardness, particle size,composition, etc.).

Q2: How to choose the right mineral processing equipment?
A2: When selecting equipment, the following factors should be comprehensively considered: the nature of theore; Capacity demand Site conditions Environmental protection requirements, We ofer free technical consulta-tion and can send engineers to the site for inspection to recommend the best solution.

Q3: How about the energy consumption and effciency of the equipment?
A3: Our equipment adopts an energy-saving design. Compared with traditional equipment, it can reduce energyconsumption by 10% to 30%, and improve processing effciency by optimizing the structure. The specifc dataneed to be evaluated based on the process confguration.

Q4: Can you provide renovation and upgrading services for the existing production lines?
A4: Sure! We offer, partial equipment replacement for old production lines; Automated transformation Environ-mental protection upgrade and other services.

Q5: How is after-sales support guaranteed?
A5: Warranty period: 1-2 years for core equipment (subject to the contract specifcally);Spare parts supply: Always keep a stock of vulnerable parts and deliver them within 48 hours in case of emer-gency.Technical services: Remote guidance + on-site support to ensure prompt problem-solving.

Q6: How long is the equipment delivery and installation cycle?
A6: $tandard equipment is in stock and will be dispatched within 15 days. The production cycle for customizedequipment is approximately 1 to 3 months (depending on complexity).linstallation and commissioning are carriedout by a professional team and usually take 1 to 4 weeks.

You can submit your requirements via email, phone or online

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier