Premium Gold Mill Mining Equipment with 1500mm Roller and 2000mm Pan

Product Details
Customization: Available
Type: Hard Rock Gold Mining Equipment
Motor Type: AC Motor
Diamond Member Since 2025

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Flexible Customization
The supplier provides Flexible customization services for your Personalized requirements
R&D Capabilities
The supplier has 1 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (8)
  • Premium Gold Mill Mining Equipment with 1500mm Roller and 2000mm Pan
  • Premium Gold Mill Mining Equipment with 1500mm Roller and 2000mm Pan
  • Premium Gold Mill Mining Equipment with 1500mm Roller and 2000mm Pan
  • Premium Gold Mill Mining Equipment with 1500mm Roller and 2000mm Pan
  • Premium Gold Mill Mining Equipment with 1500mm Roller and 2000mm Pan
  • Premium Gold Mill Mining Equipment with 1500mm Roller and 2000mm Pan
Find Similar Products
  • Overview
  • Product Description
  • Technical Parameters
  • Certifications
  • Packing & Delivery
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
JM-1500
Motor Power
5.5kw
Application
Mine
Materials
Stone,Ore,Coal,Sand,Gold
Outlet Size
18-48mm
Inlet Size
300×1300mm
Condition
New
Warranty
1 Years
After-sales Service
Online Video or Dispatch After-Sales Team
Grinding Roller Diameter (mm)
1500±20
Thickness of Grinding Roller (mm)
300±20 250±20 400±20
Grinding Pan Diameter(mm)
2000±20 2100±20
Thickness of Grinding Pan(mm)
150±30 180±30
Width of Grinding Pan(mm)
450
Speed (R/Min)
20-22
Power(Kw)
22
Capacity(T/H)
7-8
Weight(T)
12
Transport Package
Standard Wooden Case
Specification
3020*2400*2100
Trademark
ZHIYAN
Origin
Jiangxi, China
HS Code
8459590000
Production Capacity
50 Set/Year

Product Description

Premium Gold Mill Mining Equipment with 1500mm Roller and 2000mm Pan
Product Description

Gold grinding machine is mainly working for preliminary grinding for gold, silver, lead, zinc,iron, molybdenum,copper, antimony ore concentration, but also one of the main replaced equipment of ball mill. The device is suitable in small-scale mining, transportation inconvenience, lack of electricity supply in remote mine. It's with simple installation, lower investment, high output, lower production costs and fast grinding speed and so on.
Premium Gold Mill Mining Equipment with 1500mm Roller and 2000mm Pan
Premium Gold Mill Mining Equipment with 1500mm Roller and 2000mm Pan
Premium Gold Mill Mining Equipment with 1500mm Roller and 2000mm Pan
Premium Gold Mill Mining Equipment with 1500mm Roller and 2000mm Pan
Premium Gold Mill Mining Equipment with 1500mm Roller and 2000mm Pan
Premium Gold Mill Mining Equipment with 1500mm Roller and 2000mm Pan
Premium Gold Mill Mining Equipment with 1500mm Roller and 2000mm Pan
Premium Gold Mill Mining Equipment with 1500mm Roller and 2000mm Pan
Technical Parameters
Model
JM-1600
JM-1500
JM-1400
JM-1300
JM-1200I
JM-1200II
JM-1100
JM-1000
JM-900
Grinding Roller Diameter
(mm)
1600±20
1500±20
1400±20
1300±20
1200±20
1200±20
1100±20
1000±20
900±20
Thickness of Grinding Roller
(mm)
400±20
300±20
250±20
400±20
250±20
250±20
220±20
200±20
200±20
200±20
160±20
Grinding Pan Diameter(mm)
2100±20
2000±20
2100±20
200±20
2000±20
1800±20
1800±20
1800±20
1800±30
1700±30
Thickness of Grinding Pan(mm)
180±30
150±30
180±30
150±20
150±20
100±20
100±20
80±20
80±20
50±20
Width of Grinding Pan(mm)
500
450
360
360
270
250
250
250
200
Speed
(r/min)
20-22
20-22
16-18
16-18
13-18
13-18
13-18
13-18
13-18
Power(kw)
30
22
15
11
7.5
7.5
5.5
5.5
3
Capacity(t/h)
9-10
7-8
5-6
3-4
1-2
0.8-1
0.5-0.8
0.3-0.5
0.2-0.3
Weight(t)
16
12
9.5
8
6
5
4.5
4
3
Premium Gold Mill Mining Equipment with 1500mm Roller and 2000mm Pan
Premium Gold Mill Mining Equipment with 1500mm Roller and 2000mm Pan
Certifications
Premium Gold Mill Mining Equipment with 1500mm Roller and 2000mm Pan
Packing & Delivery
Premium Gold Mill Mining Equipment with 1500mm Roller and 2000mm Pan
Company Profile
Premium Gold Mill Mining Equipment with 1500mm Roller and 2000mm Pan
Zhiyan Future Machinery Equipment (Xiamen) Co., Ltd.
Zhiyan Future Machinery Equipment (Xiamen) Co., Ltd. was established in Xiamen City, Fujian Province. The company adheres to the values of "intelligent innovation and Precision Engineering, jointly Expanding Green Energy", empowering the sustainable development of the global mining industry with technology, and helping to build a new ecosystem for efficient resource utilization.
Our company specializes in the manufacturing of mineral processing and related equipment, with a diverse product line that encompasses a wide range of series products, including gravity separation equipment, crushing equipment, pulverizing equipment, hydraulic mineral processing equipment, flotation equipment, screening equipment, sand-making equipment magnetic separation equipment, gold panning equipment, as well as various other mineral processing equipment. Specific products include, but are not limited to, shaking tables, ball mils, rod mills, jigging machines, spiral chutes, jaw crushers,hammer crushers, impact crushers, spiral classifiers, hydraulic classifiers, hydrocyclones, flotation machines, agitators magnetic separators, sand pumps, vibrating screens, sand-making machines, tailings recovery machines, feeders, ore feeders, conveyors, and original factory parts for the equipment, fully meeting customers' needs in equipment usage and maintenance.
FAQ

Q1: What types of ores is your equipment suitable for?
A1: The mineral processing equipment we provide is suitable for various ores, including but not limited to: metallic ores, non-metallic ores, rare ores, etc. The process flow can be customized according to the characteristics of the ore (hardness, particle size, composition, etc.).
Q2: How to choose the right mineral processing equipment?
A2: When selecting equipment, the following factors should be comprehensively considered: the nature of the ore; Capacity demand Site conditions Environmental protection requirements. We offer free technical consultation and can send engineers to the site for inspection to recommend the best solution.
Q3: How about the energy consumption and efficiency of the equipment?
A3: Our equipment adopts an energy-saving design. Compared with traditional equipment, it can reduce energy consumption by 10% to 30%, and improve processing efficiency by optimizing the structure. The specific data need to be evaluated based on the process configuration.
Q4: Can you provide renovation and upgrading services for the existing production lines?
A4: Sure! We offer: partial equipment replacement for old production lines; Automated transformation Environmental protection upgrade and other services.
Q5: How is after-sales support guaranteed?
A5: Warranty period: 1-2 years for core equipment (subject to the contract specifically);
Spare parts supply: Always keep a stock of vulnerable parts and deliver them within 48 hours in case of emergency.
Technical services: Remote guidance + on-site support to ensure prompt problem-solving.
Q6: How long is the equipment delivery and installation cycle?
A6: Standard equipment is in stock and will be dispatched within 15 days. The production cycle for customized equipment is approximately 1 to 3 months (depending on complexity). Installation and commissioning are carried out by a professional team and usually take 1 to 4 weeks.
You can submit your requirements via email, phone or online

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier